Templates · Area
Testing lab
Samples prepared at a bench, run on six testers, results recorded. Two shifts.
Open it in LinewiseSee pricing
Opens in your browser as a demo copy: nothing to install, nothing saved until you choose.
What is in the model
- Work arriving
- 4 jobs an hour from 06:00 to 20:00, about 56 a day, 5 days a week
- Equipment
- 6 × Tester
- Shifts
- Early 06:00–14:00, 2 people; Late 14:00–22:00, 2 people
| Task | Minutes | Where | Who |
|---|---|---|---|
| Sample prep | 8 | Prep bench | Anyone on shift |
| Setup | 6 | Tester | Anyone on shift |
| Test run | 45 | Tester | Runs unattended |
| Cleandown | 5 | Tester | Anyone on shift |
| Record results | 8 | Results desk | Anyone on shift |
Every figure can be changed: rename anything, move it on the floor, add tasks, shifts or stations.
Things to try
- Add a person to one shift and compare output, turnaround and cost per job.
- Add a unit of equipment and see whether the extra output pays for it.
- Change the arrival rate to next year’s demand and see where work starts to queue.
- Play the week back and use the heat map to find wasted walking.
Make it yours
Open this template, change it to match your own area, and keep it when it is right.
Other area templates
Filling line
Long automated fill runs on three fillers with setup and cleandown. Three shifts, seven days.
See the template →CNC machining cell
Four machines: load and set, an unattended machining run, unload and deburr, then inspection by a skilled person.
See the template →Heat treatment (batches)
Two ovens that each take eight jobs per load, wait up to an hour for a full load, and need a changeover between loads.
See the template →Packing and dispatch
Manual work at benches only: pick, pack, label. A fifth of orders are urgent with a 2-hour target.
See the template →